Lift and Shift
Project Overview
Bowers Electrical asked Fortis to install two new 4.2-tonne transformers in the upper-level substation at the Newsprinters print site in Knowsley, Liverpool. There was no crane access to the substation. Each transformer had to come in through the building, along corridors, through doorways and up in a goods lift.
Fortis delivered the job as a full lift and shift operation, using a remote-controlled Power Skate load moving system. Both transformers were moved from the loading area to their final position without a single push or pull.
The Challenge
The transformers were going into a live, working print site. The route from the delivery point to the substation was long, tight and full of obstacles.
- No crane access to the upper-level substation
- Narrow corridors and doorways with little room either side of the load
- A 90-degree turn into a goods lift, with thresholds and grooves at each landing
- A final run between live switchgear and fire suppression equipment
Each transformer weighed 4.2 tonnes. The goods lift was rated at 5 tonnes. There was no room for error.
The Solution
Fortis surveyed the full route and wrote a lift and shift plan covering every stage, from the loading area to the final position against the substation wall. Bowers offloaded each transformer by Hiab onto timbers laid on levelling mats. Fortis then jacked each unit and set it down onto a Power Skate at the front and roto skates at the rear.
The Power Skate is driven by remote control. The operator steered each transformer through the building while a second rigger guided the rear skates, working together to line the load up through every doorway. Transition plates brought the skates down from the mats in small steps, and steel plate on rubber bridged the lift thresholds.
The weights were checked against the lift capacity before the job. Each transformer and its skates came to 4,354 kg, leaving room for two operatives to travel with the load. Fortis provided the lift plan, Appointed Person and lift supervision throughout, under full contracted lifting and handling conditions.
Specialist Equipment
Remote-controlled Power Skate
A battery-powered drive skate that moves heavy loads by remote control, giving millimetre control in tight spaces with nobody pushing or pulling.
Roto skates and levelling mats
Steerable roto skates carried the rear of each transformer, while levelling mats and transition plates gave a smooth, flat route into the building.
Full lift and shift framework
Fortis owned the lift plan, RAMS and on-site supervision, so Bowers could focus on the electrical installation.


Tight route. Heavy load. No drama.
Both transformers were moved through the building, up in the lift and set down in the substation safely and to plan. The skates were removed and the units were left ready for Bowers to connect.
No crane, no building alterations and no manual handling of the load.
Project gallery
More from the job
On Site
See us in action