Lift and Shift

Project Overview

Bowers Electrical asked Fortis to install two new 4.2-tonne transformers in the upper-level substation at the Newsprinters print site in Knowsley, Liverpool. There was no crane access to the substation. Each transformer had to come in through the building, along corridors, through doorways and up in a goods lift.

Fortis delivered the job as a full lift and shift operation, using a remote-controlled Power Skate load moving system. Both transformers were moved from the loading area to their final position without a single push or pull.

  • Location: Newsprinters, Knowsley, Liverpool (Merseyside)

  • Client: Bowers Electrical

  • Primary Assets: 2 x 4.2-tonne transformers

  • Equipment: Remote-controlled Power Skate load moving system, roto skates, levelling mats and transition plates

  • Set-up: Ground-floor loading area, internal corridors and goods lift to an upper-level substation

  • Project Type: Lift and Shift – transformer installation

The Challenge

The transformers were going into a live, working print site. The route from the delivery point to the substation was long, tight and full of obstacles.

  • No crane access to the upper-level substation
  • Narrow corridors and doorways with little room either side of the load
  • A 90-degree turn into a goods lift, with thresholds and grooves at each landing
  • A final run between live switchgear and fire suppression equipment

Each transformer weighed 4.2 tonnes. The goods lift was rated at 5 tonnes. There was no room for error.

The Solution

Fortis surveyed the full route and wrote a lift and shift plan covering every stage, from the loading area to the final position against the substation wall. Bowers offloaded each transformer by Hiab onto timbers laid on levelling mats. Fortis then jacked each unit and set it down onto a Power Skate at the front and roto skates at the rear.

The Power Skate is driven by remote control. The operator steered each transformer through the building while a second rigger guided the rear skates, working together to line the load up through every doorway. Transition plates brought the skates down from the mats in small steps, and steel plate on rubber bridged the lift thresholds.

The weights were checked against the lift capacity before the job. Each transformer and its skates came to 4,354 kg, leaving room for two operatives to travel with the load. Fortis provided the lift plan, Appointed Person and lift supervision throughout, under full contracted lifting and handling conditions.

Specialist Equipment

Remote-controlled Power Skate

A battery-powered drive skate that moves heavy loads by remote control, giving millimetre control in tight spaces with nobody pushing or pulling.

Roto skates and levelling mats

Steerable roto skates carried the rear of each transformer, while levelling mats and transition plates gave a smooth, flat route into the building.

Full lift and shift framework

Fortis owned the lift plan, RAMS and on-site supervision, so Bowers could focus on the electrical installation.

Fortis operative steering a wrapped transformer on skates by remote control past switchgear
Transformer travelling on a Power Skate load moving system along a substation corridor in Liverpool

Tight route. Heavy load. No drama.

Both transformers were moved through the building, up in the lift and set down in the substation safely and to plan. The skates were removed and the units were left ready for Bowers to connect.

No crane, no building alterations and no manual handling of the load.

Project gallery

More from the job

City crane outrigger on a spreader pad beside a Birmingham apartment development

The final run took each transformer between live switchgear panels and fire suppression cylinders, with the operator steering from a safe distance.

On Site

See us in action

Transformer driven along a service corridor on a power load moving system 0:32
A wrapped transformer travels down a narrow service corridor on power load moving units, with warning beacons lit, steered by a Fortis operator.

Operator steering a transformer by radio remote 0:30
A Fortis operator walks alongside and steers a transformer on power load moving units using the handheld radio remote.

Transformer on a power load moving system at a plant room doorway 0:10
A remote-controlled power load moving system carries a wrapped transformer across a switch room floor (portrait clip).

Transformer nearing its final position between switchgear panels at the Newsprinters print site

The right kit for the route, not just the load.

Why choose Fortis for transformer installations?

Moving heavy plant inside a working building is about more than weight. Fortis plans the whole route, from the delivery vehicle to the final position, and picks the equipment to suit every doorway, floor and lift on the way. Got a transformer, switchgear or plant move into a tight space in Liverpool or beyond? Speak to Fortis Heavy Lift Group

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action

Explore our latest projects and achievements.