Contract Lifting
Project Overview
ITV Studios brought in Fortis Heavy Lift Group to install, and later remove, the Plank Game for I’m a Celebrity… Get Me Out of Here! The challenge set was built on the very edge of Moel Tryfan Quarry in North Wales, cantilevered out over a sheer slate face with a flooded quarry pit far below.
Fortis delivered the job as a Full Contract Lift. A Böcker RK 36/2400 tracked crawler crane, supplied by Lift Leicester, tracked over a mile from the public road across open moorland to reach the quarry rim. From there it lifted every section of the truss structure into place.
The Challenge
Television needs drama, and few places deliver it like the rim of a Welsh slate quarry. That made it one of the hardest places to get a crane into.
Several challenges had to be overcome:
- No road to the quarry edge, only over a mile of rough, boggy moorland
- Setting a crane up safely right on the rim of a sheer quarry face
- Lifting truss sections out over the drop for riggers working at height
- Mountain weather, with low cloud and fog rolling over the site during the build
- A live TV production schedule, with an install before filming and a removal after
A wheeled mobile crane would never have made it to the lift position.
The Solution
Fortis chose the Böcker RK 36/2400 because it combines a long, lightweight boom with a tracked crawler chassis. The crane crawled the full distance from the road to the quarry on its own tracks. It then set up on its outriggers on the heather at the quarry rim.
From that single position, the crane lifted the truss structure out over the edge one section at a time. Riggers in harnesses received and bolted each piece in place, building up the towers, the cantilevered walkway and the overhead frame that would carry the planks.
Fortis planned and managed every lift as a Full Contract Lift, working alongside ITV Studios’ production and set-build teams. After filming, the team returned to lift the set out and leave the quarry clear.
Specialist Equipment
Böcker RK 36/2400 tracked crawler crane
A long-reach aluminium boom on a crawler chassis, able to travel over soft moorland and set up on the quarry edge.
Off-road access planning
A planned route for over a mile of tracking from the public road to the lift position.
Full Contract Lift framework
Fortis owned the lift planning, RAMS and lift management for both the installation and the removal.


Built for the cameras, lifted with care
The Plank Game was built safely and on schedule, ready for one of the series’ most nerve-testing trials, with a sheer drop to the quarry lake below the planks. Once filming wrapped, Fortis returned to remove the set.
It was one of the standout projects of the year for the Fortis team, and proof that this crane really does reach the places other cranes struggle to reach.
Project gallery
More from the job

Contract Lifting
Project Overview
ITV Studios brought in Fortis Heavy Lift Group to install, and later remove, the Plank Game for I’m a Celebrity… Get Me Out of Here! The challenge set was built on the very edge of Moel Tryfan Quarry in North Wales, cantilevered out over a sheer slate face with a flooded quarry pit far below.
Fortis delivered the job as a Full Contract Lift. A Böcker RK 36/2400 tracked crawler crane, supplied by Lift Leicester, tracked over a mile from the public road across open moorland to reach the quarry rim. From there it lifted every section of the truss structure into place.
- Location: Moel Tryfan Quarry, Gwynedd, North Wales
- Client: ITV Studios
- Production: I’m a Celebrity… Get Me Out of Here! [confirm series year: the live-site post is dated December 2021]
- Scope: Installation and removal of the Plank Game challenge set
- Crane: Böcker RK 36/2400 tracked crawler crane, supplied by Lift Leicester
- Access: Over a mile of tracking across moorland from the public road
- Project Type: Full Contract Lift
The Challenge
Television needs drama, and few places deliver it like the rim of a Welsh slate quarry. That made it one of the hardest places to get a crane into.
Several challenges had to be overcome:
- No road to the quarry edge, only over a mile of rough, boggy moorland
- Setting a crane up safely right on the rim of a sheer quarry face
- Lifting truss sections out over the drop for riggers working at height
- Mountain weather, with low cloud and fog rolling over the site during the build
- A live TV production schedule, with an install before filming and a removal after
A wheeled mobile crane would never have made it to the lift position.
The Solution
Fortis chose the Böcker RK 36/2400 because it combines a long, lightweight boom with a tracked crawler chassis. The crane crawled the full distance from the road to the quarry on its own tracks. It then set up on its outriggers on the heather at the quarry rim.
From that single position, the crane lifted the truss structure out over the edge one section at a time. Riggers in harnesses received and bolted each piece in place, building up the towers, the cantilevered walkway and the overhead frame that would carry the planks.
Fortis planned and managed every lift as a Full Contract Lift, working alongside ITV Studios’ production and set-build teams. After filming, the team returned to lift the set out and leave the quarry clear.
Specialist Equipment
Böcker RK 36/2400 tracked crawler crane
A long-reach aluminium boom on a crawler chassis, able to travel over soft moorland and set up on the quarry edge.
Off-road access planning
A planned route for over a mile of tracking from the public road to the lift position.
Full Contract Lift framework
Fortis owned the lift planning, RAMS and lift management for both the installation and the removal.
Built for the cameras, lifted with care
The Plank Game was built safely and on schedule, ready for one of the series’ most nerve-testing trials, with a sheer drop to the quarry lake below the planks. Once filming wrapped, Fortis returned to remove the set.
It was one of the standout projects of the year for the Fortis team, and proof that this crane really does reach the places other cranes struggle to reach.
Project gallery
More from the job
Riggers assembling the Plank Game truss structure on the quarry edge as the crawler crane lifts
Finished Plank Game platform with its yellow star above Moel Tryfan Quarry
Over a mile of track. One quarry edge. Lights, camera, lift.
Why choose Fortis for TV, film and event lifts?
Productions and events often happen in places that were never built for cranes. Fortis plans the access, chooses the right crane and manages every lift around your production schedule. Planning a set build or event in a remote location? Contact Fortis Heavy Lift Group.