Avon needed heavy glass units replaced high up inside the glazed atrium of its multi-storey building in Northampton. The replacement needed a spider crane working at an upper-level step, but there was no way to drive one up there.

Fortis Heavy Lift Group’s answer was to lift a crane with a crane. A 60-tonne mobile crane, set up inside the atrium on crane mats, lifted a UNIC 706 spider crane to the high-level step. The spider crane then tracked to each position and completed the glass installation.

  • Location: Northampton

  • Client: Avon

  • Primary Assets: Heavy high-level glass units

  • Cranes: 60-tonne mobile crane and UNIC 706 spider crane

  • Floor Protection: Crane mats across the atrium floor

  • Project Type: Specialist glass installation

The Challenge

The glass was in reach of a spider crane, but only if the spider crane could get up to it.

Several challenges had to be overcome:

  • Getting a mini crane up to the correct level to reach the high glass units
  • Very limited access around the building
  • Setting up a large mobile crane inside a finished atrium and foyer
  • Protecting the foyer floor throughout

The Solution

Fortis positioned a 60-tonne mobile crane inside the building’s atrium and foyer, with crane mats laid to protect the floor.

The mobile crane lifted the UNIC 706 spider crane up to the high-level step. Once there, the spider crane tracked through the main entrance area to each removal and installation position, where it took out the old units and installed the new glass.

Specialist Equipment

UNIC 706 spider crane

A compact tracked crane with the reach and capacity to handle heavy high-level glass.

60-tonne mobile crane

Set up inside the atrium to lift the spider crane up to the working level.

Crane mats and floor protection

Spread the crane’s loads and protected the foyer’s finished floor.

View out through the glazed atrium of Avon's Northampton building, where the glass units were replaced
Spider crane tracking through the main entrance of the Avon building

A crane to lift a crane

The glass installation was completed successfully, with no damage to the foyer floor.

A two-crane solution turned an inaccessible upper level into a safe working platform, and left a very happy client.

View out through the glazed atrium of Avon's Northampton building, where the glass units were replaced

When access runs out, think one crane higher.

Why choose Fortis for high-level glass installation?

High-level glazing in atriums and multi-storey buildings often needs creative crane solutions. Fortis plans multi-crane lifts, protects finished interiors and installs heavy glass safely at height. Need glass replaced in a hard-to-reach place? Contact Fortis Heavy Lift Group.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action

Explore our latest projects and achievements.