Project Overview
Avon needed heavy glass units replaced high up inside the glazed atrium of its multi-storey building in Northampton. The replacement needed a spider crane working at an upper-level step, but there was no way to drive one up there.
Fortis Heavy Lift Group’s answer was to lift a crane with a crane. A 60-tonne mobile crane, set up inside the atrium on crane mats, lifted a UNIC 706 spider crane to the high-level step. The spider crane then tracked to each position and completed the glass installation.
The Challenge
The glass was in reach of a spider crane, but only if the spider crane could get up to it.
Several challenges had to be overcome:
- Getting a mini crane up to the correct level to reach the high glass units
- Very limited access around the building
- Setting up a large mobile crane inside a finished atrium and foyer
- Protecting the foyer floor throughout
The Solution
Fortis positioned a 60-tonne mobile crane inside the building’s atrium and foyer, with crane mats laid to protect the floor.
The mobile crane lifted the UNIC 706 spider crane up to the high-level step. Once there, the spider crane tracked through the main entrance area to each removal and installation position, where it took out the old units and installed the new glass.
Specialist Equipment
UNIC 706 spider crane
A compact tracked crane with the reach and capacity to handle heavy high-level glass.
60-tonne mobile crane
Set up inside the atrium to lift the spider crane up to the working level.
Crane mats and floor protection
Spread the crane’s loads and protected the foyer’s finished floor.


A crane to lift a crane
The glass installation was completed successfully, with no damage to the foyer floor.
A two-crane solution turned an inaccessible upper level into a safe working platform, and left a very happy client.