Plant & Machine Movement

Project Overview

Fortis Heavy Lift Group was called in to support a high-profile project in central London, installing 25-tonne generators at basement level. Fortis supplied crane supervisors, slinger signallers and lift and shift engineers.

A 500-tonne mobile crane rigged with a luffing jib offloaded the generators and lowered them to the basement. The Fortis team then jacked and skated each load 30 metres across a route full of obstacles to its final position.

  • Location: Central London

  • Primary Assets: 25-tonne generators

  • Crane: 500-tonne mobile crane on luffing jib

  • Horizontal Move: 30 metres by jacks and skates at basement level

  • Fortis Personnel: Crane supervisors, slinger signallers, lift and shift engineers

  • Project Type: Plant movement and installation

The Challenge

Heavy plant had to go down into a city-centre basement and then travel a long way once it got there.

Several challenges had to be overcome:

  • Lifting 25-tonne loads on a congested central London street
  • Lowering each generator safely to basement level
  • Moving each load 30 metres horizontally at basement level
  • Clearing many obstacles along the basement route

The Solution

A 500-tonne mobile crane on a luffing jib gave the capacity and close-in reach to offload each generator and lower it to the basement in a tightly controlled lift. Fortis crane supervisors and slinger signallers ran every lift.

Once at basement level, Fortis lift and shift engineers took over. Using hydraulic jacks and machine skates, they moved each 25-tonne generator 30 metres across the basement, working carefully around the obstacles, and set it down in its final position.

Specialist Equipment

500-tonne mobile crane on luffing jib

High capacity with steep, close-in reach for lowering heavy plant into a basement.

Hydraulic jacks and machine skates

Lifted and rolled each 25-tonne load 30 metres to its final position.

Fortis lifting team

Crane supervisors, slinger signallers and lift and shift engineers on every stage.

500-tonne mobile crane being rigged with a luffing jib on a central London street
500-tonne mobile crane being rigged with a luffing jib on a central London street

From street to basement to final position

Every generator was offloaded, lowered to basement level and skated into position safely, completing a demanding plant installation on a high-profile central London project.

500-tonne mobile crane being rigged with a luffing jib on a central London street

500 tonnes of crane. 30 metres of skating. Every load in position.

Why choose Fortis for basement plant installations in London?

Heavy plant in London basements needs big cranes, precise rigging and skilled skating teams working as one. Fortis supplies the lifting personnel and lift and shift engineers to get generators and transformers from the street to their final position. Planning a heavy basement install? Contact Fortis Heavy Lift Group.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.