Plant & Machine Movement
Project Overview
Fortis Heavy Lift Group was called in to support a high-profile project in central London, installing 25-tonne generators at basement level. Fortis supplied crane supervisors, slinger signallers and lift and shift engineers.
A 500-tonne mobile crane rigged with a luffing jib offloaded the generators and lowered them to the basement. The Fortis team then jacked and skated each load 30 metres across a route full of obstacles to its final position.
The Challenge
Heavy plant had to go down into a city-centre basement and then travel a long way once it got there.
Several challenges had to be overcome:
- Lifting 25-tonne loads on a congested central London street
- Lowering each generator safely to basement level
- Moving each load 30 metres horizontally at basement level
- Clearing many obstacles along the basement route
The Solution
A 500-tonne mobile crane on a luffing jib gave the capacity and close-in reach to offload each generator and lower it to the basement in a tightly controlled lift. Fortis crane supervisors and slinger signallers ran every lift.
Once at basement level, Fortis lift and shift engineers took over. Using hydraulic jacks and machine skates, they moved each 25-tonne generator 30 metres across the basement, working carefully around the obstacles, and set it down in its final position.
Specialist Equipment
500-tonne mobile crane on luffing jib
High capacity with steep, close-in reach for lowering heavy plant into a basement.
Hydraulic jacks and machine skates
Lifted and rolled each 25-tonne load 30 metres to its final position.
Fortis lifting team
Crane supervisors, slinger signallers and lift and shift engineers on every stage.


From street to basement to final position
Every generator was offloaded, lowered to basement level and skated into position safely, completing a demanding plant installation on a high-profile central London project.