Project Overview
Fortis Heavy Lift Group delivered a precision lift and shift of high-efficiency heat recovery units at a facility in Shrewsbury. The units had to be distributed across two floors and routed through highly restricted internal corridors.
Using advanced handling techniques and Genie lifts, the rigging team delivered each unit to its plant room. Every unit was then laser-levelled to manufacturer tolerances and fixed in place, ready for commissioning.
The Challenge
The heat recovery units were large, fragile and destined for plant rooms reached only through tight, low-clearance corridors.
Several significant challenges had to be overcome:
- Vertical transport of heavy units across two floors
- Narrow corridors requiring multiple changes of direction
- Low clearances limiting overhead handling
- Protecting the surrounding building fabric
- Exact levelling for efficient operation
The route left no room for conventional handling, so every turn had to be planned in advance.
The Solution
Fortis combined expert rigging with Genie lifts to control each unit through the building. Where the corridors demanded it, the team executed double-rotation directional changes to bring units around tight corners without contact.
Once in their plant rooms, the units were laser-levelled to manufacturer tolerances and mechanically fixed, giving the client a complete turnkey installation.
Specialist Equipment
To achieve safe handling and exact alignment, Fortis deployed:
Genie lifts
Genie lifts supported precision handling, overhead lifting and controlled positioning in confined spaces.
Specialist rigging for double rotations
Expert rigging techniques allowed the team to rotate bulky units twice through tight corridors without damaging the building.
Laser-levelling technology
Advanced laser levelling ensured each unit sat within exact manufacturer tolerances before final fixing.


Levelled, fixed and ready to commission
The hardest part of the job was the route, not the lift.
Through careful planning and controlled double rotations, every unit reached its plant room with the building fabric intact. Each was then laser-levelled and securely fixed in position.
The client received perfectly balanced plant, installed across two floors and ready for immediate commissioning.