Lift & Shift

Project Overview

A homeowner in Kensington wanted a swim spa installed in the back garden of their townhouse. The basin was large, and the only route to the rear of the property was an 800 mm passage between the house and the neighbouring wall.

Fortis Heavy Lift Group solved it in stages: a spider crane turned the basin onto its side at the front, skates carried it through the house, and a UNIC 295 mini crane, folded down to pass along the side passage, lifted it into the ground at the back.

Examples of work: 

  • Location: Kensington, London

  • Client: Private homeowner

  • Primary Asset: Swim spa basin

  • Cranes: Spider crane (front garden) and UNIC 295 mini crane (rear garden)

  • Handling: Machine skates and floor protection

  • Access: 800 mm side passage

  • Project Type: Lift and Shift

The Challenge

The spa basin was far too big for the side passage, and there was no other way into the garden.

Several challenges had to be overcome:

  • An 800 mm side passage as the only external route to the garden
  • A basin too wide to pass along it
  • Moving a heavy, bulky load through a finished family home
  • Setting up a crane in a back garden with no vehicle access

The Solution

Fortis set up a spider crane in the front garden and used it to turn the basin onto its side. In that position it could travel through the property on skates, over full floor protection, to the back of the house.

At the same time, one of our UNIC 295 mini cranes was folded up and tracked along the 800 mm side passage. Once in the back garden it was set up on ground protection and used to lift the basin into position in the ground.

Specialist Equipment

UNIC 295 mini crane

Folds down narrow enough to track through tight passages, then sets up as a capable crane on the other side.

Spider crane

Turned the basin onto its side at the front of the property, ready to pass through the house.

Machine skates and floor protection

Moved the basin through the home over protected floors, with no damage to finishes.

UNIC 295 mini crane folded down to pass along the narrow side passage of a Kensington townhouse
Fortis operatives moving a swim spa basin through a townhouse over floor protection

Through the house, into the ground

The swim spa basin was lifted and installed successfully and safely, with no damage to the basin or the home.

The homeowner was delighted to have their spa in place, with the garden and the house left exactly as they were.

Project gallery

More from the job

City crane outrigger on a spreader pad beside a Birmingham apartment development

Wrapped swim spa basin on its side, being moved through a Kensington townhouse

Mini crane passing along the narrow side passage of a London townhouse

Why choose Fortis for residential lift and shift?

An 800 mm gap. A full-size swim spa. No problem.

Townhouses and city gardens rarely come with easy access. Fortis uses mini cranes, spider cranes and specialist handling kit to move heavy items into places other lifting firms cannot reach. Planning a hot tub, swim spa or heavy item installation in London? Contact Fortis Heavy Lift Group for a solution.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action

Explore our latest projects and achievements.