Fortis Heavy Lift Group has an ongoing contract with several engineering companies to provide transport solutions and contract lifts across the UK. At Winscombe Water Recycling Centre on Max Mill Lane, near Bristol, Fortis collected water treatment plant from Dover and lifted it into its final position on site.

The loads included skid pumps, clean water backwash tanks and vessels. The route into site was extremely tight and crossed by high-voltage overhead power lines.

Examples of work: 

  • Location: Winscombe WRC, Max Mill Lane, near Bristol

  • Primary Assets: Skid pumps, clean water backwash tanks and vessels

  • Transport: Collected from Dover and delivered to site by Fortis

  • Crane: Mobile crane, contract lift

  • Project Type: Transport and contract lift

  • Key Hazards: Very tight access route, high-voltage overhead power lines

The Challenge

A rural water recycling site meant narrow lanes, tight turns and live power lines overhead.

Several challenges had to be overcome:

  • An extremely tight access route into site
  • High-voltage overhead power lines near the route and lift area
  • Large tanks and vessels with challenging transport dimensions
  • Turning circles and access for both the transport and the crane

The Solution

Fortis planned the job in depth. Transport dimensions and turning circles were checked against the route, and the access needed for the crane and lifting equipment was worked out in advance.

Fortis attended site and held meetings with every stakeholder before installation, so each hurdle was identified and solved before the day. Fortis then collected the plant from Dover, delivered it along the tight route and lifted each item into its final position.

Specialist Equipment

Mobile crane contract lift

Positioned to complete the lifts while staying clear of the overhead power lines.

Transport solutions

Fortis-managed collection from Dover and delivery to site, planned around the route’s turning circles.

Stakeholder planning

Pre-installation site meetings so every issue was solved before mobilisation.

Fortis team positioning a backwash vessel beside pipework at Winscombe WRC
Fortis operative overseeing a delivery lorry on the tight access track into site

No surprises on the day

Every skid pump, tank and vessel was delivered from Dover and installed in its final position safely.

Because every hurdle had been identified and overcome in advance, there were no issues on installation day.

Large water treatment tank on a trailer along a narrow country lane

Why choose Fortis for transport and contract lifts?

Collected, delivered and installed. One contractor, door to door.

Utility and infrastructure sites often come with narrow access and overhead hazards. Fortis combines transport, crane and lift planning in one package, from collection to final positioning. Got plant to deliver and install on a tricky site? Contact Fortis Heavy Lift Group.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action

Explore our latest projects and achievements.