Contract Lifting

Project Overview

Fortis Heavy Lift Group delivered a full contract lift for Mitie, installing roof plant units onto a rooftop plant deck in Southend-on-Sea town centre. Fortis covered the whole job: transport, crane, road closure and traffic management.

A 6-axle Spierings mobile tower crane fitted with modular spreader beams lifted each 6-tonne unit and set it down level on the plant deck.

  • Location: Southend-on-Sea town centre, Essex

  • Client: Mitie

  • Primary Assets: 6-tonne roof plant units

  • Crane: 6-axle Spierings mobile tower crane

  • Rigging: Modular spreader beams

  • Project Type: Full Contract Lift

  • Traffic Management: Road closure, managed by Fortis

  • Additional Scope: Transport solutions

The Challenge

The plant had to go up and over occupied town-centre buildings to a high rooftop deck, on a working street.

Several challenges had to be overcome:

  • Lifting long, heavy units over neighbouring buildings to roof level
  • Keeping every unit level so it would land cleanly on its plinths
  • Closing a public road and keeping pedestrians clear of the lift zone
  • Timing deliveries so lorries arrived when the crane was ready for them

With the road closed for a fixed period, the lift sequence had to run without delays.

The Solution

Fortis chose a 6-axle Spierings mobile tower crane. It sets up in a compact footprint like a mobile crane and gives the height and reach of a tower crane, which let it clear the buildings and reach the plant deck from the street.

The modular spreader beams were configured to suit each unit’s lifting points. That spread the load evenly and kept the units level from the lorry bed to the plant deck.

Fortis arranged the transport, the road closure and the on-street management in-house. Our Appointed Person planned every lift, so the client dealt with one contractor from start to finish.

Specialist Equipment

6-axle Spierings mobile tower crane

Tower-crane reach and height from a mobile chassis, rigged in a tight town-centre footprint.

Modular spreader beams

Configured to the units’ lifting points, so each 6-tonne unit stayed level throughout the lift.

Road closure and traffic management

Fortis managed the closure and the public interface, keeping the street safe while the crane was working.

Modular spreader beams landing a roof plant unit on the plant deck at night
Roof plant unit lifted from a delivery lorry under a road closure in Southend-on-Sea

Level lifts, straight onto the plant deck

Every roof plant unit was lifted from its delivery vehicle, flown over the town centre and landed level on the plant deck.

Because Fortis ran the transport, permits, road closure and lift management together, Mitie had a single point of contact and a predictable programme.

6-tonne roof plant unit on spreader beams above Southend-on-Sea, with the sea behind

Why choose Fortis for roof plant installations?

One contractor. Transport, crane and road closure handled.

Roof plant lifts in town centres mean heavy loads, high radii and the public close by. Fortis plans the whole operation, from crane selection and spreader beam configuration to road closures and transport. Planning a rooftop plant installation? Contact Fortis Heavy Lift Group to discuss your project.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action

Explore our latest projects and achievements.