Lift & Shift

Project Overview

Fortis Heavy Lift Group installed new boilers into a basement plant room in Greenwich, where the only route down was through the building’s stairwell. Fortis worked out a way to lower the boilers down the stairwell void using a UNIC 295 mini crane set up on an upper floor.

The work was carried out out of hours, so the building’s daytime staff were not disrupted.

Examples of work: 

  • Location: Greenwich, London

  • Primary Assets: Boilers for a basement plant room

  • Crane: UNIC 295 mini crane

  • Access Route: Down the stairwell void from an upper floor

  • Timing: Out of hours

  • Project Type: Lift and Shift

The Challenge

There was no direct route for the boilers into the basement plant room.

Several challenges had to be overcome:

  • The basement could only be reached through the stairwell
  • Boilers had to be lowered over the stair handrails
  • Floor loadings on the upper level had to suit a crane
  • The building was occupied during the working day

The Solution

Fortis calculated the floor loadings first, to confirm the mini crane could safely set up on the upper floor.

The UNIC 295 then tracked along the corridor to the stairwell. The team manoeuvred each boiler in front of the crane, lifted it and lowered it down the stairwell void, clearing the handrails, to the basement level.

All of the work was done out of hours, so staff could use the building as normal during the day.

Specialist Equipment

UNIC 295 mini crane

Compact enough to track through internal corridors and set up beside the stairwell.

Floor loading calculations

Confirmed the upper floor could safely take the crane and its outrigger loads.

Out-of-hours working

Kept the building fully usable for staff during the day.

Mini crane lifting line rigged down the stairwell void to the Greenwich basement
Boiler landed at basement level at the foot of the stairwell

Down the stairwell, not the stairs

Every boiler was lowered safely to the basement and delivered to the plant room, with no disruption to the building’s daytime users.

Another very happy client, and another awkward-access lift solved with the right compact kit.

UNIC 295 spider crane set up in a corridor ready to lift boilers in Greenwich

Tricky access. Careful calculations. Out of hours.

Why choose Fortis for basement plant installations?

Basement plant rooms are some of the hardest places to get heavy equipment into. Fortis uses mini cranes, gantries and specialist handling kit, backed by proper load calculations, to install plant where access is tight. Replacing boilers or plant below ground? Contact Fortis Heavy Lift Group.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action

Explore our latest projects and achievements.

Lift & Shift

Project Overview

Fortis Heavy Lift Group installed new boilers into a basement plant room in Greenwich, where the only route down was through the building’s stairwell. Fortis worked out a way to lower the boilers down the stairwell void using a UNIC 295 mini crane set up on an upper floor.

The work was carried out out of hours, so the building’s daytime staff were not disrupted.

  • Location: Greenwich, London
  • Primary Assets: Boilers for a basement plant room
  • Crane: UNIC 295 mini crane
  • Access Route: Down the stairwell void from an upper floor
  • Timing: Out of hours
  • Project Type: Lift and Shift

The Challenge

There was no direct route for the boilers into the basement plant room.

Several challenges had to be overcome:

  • The basement could only be reached through the stairwell
  • Boilers had to be lowered over the stair handrails
  • Floor loadings on the upper level had to suit a crane
  • The building was occupied during the working day

The Solution

Fortis calculated the floor loadings first, to confirm the mini crane could safely set up on the upper floor.

The UNIC 295 then tracked along the corridor to the stairwell. The team manoeuvred each boiler in front of the crane, lifted it and lowered it down the stairwell void, clearing the handrails, to the basement level.

All of the work was done out of hours, so staff could use the building as normal during the day.

Specialist Equipment

UNIC 295 mini crane

Compact enough to track through internal corridors and set up beside the stairwell.

Floor loading calculations

Confirmed the upper floor could safely take the crane and its outrigger loads.

Out-of-hours working

Kept the building fully usable for staff during the day.

https://fortislift.co.uk/staging/wp-content/uploads/2026/10/fortis-greenwich-basement-boiler-installation-02.webp
https://fortislift.co.uk/staging/wp-content/uploads/2026/10/fortis-greenwich-basement-boiler-installation-04.webp

Down the stairwell, not the stairs

Every boiler was lowered safely to the basement and delivered to the plant room, with no disruption to the building’s daytime users.

Another very happy client, and another awkward-access lift solved with the right compact kit.

https://fortislift.co.uk/staging/wp-content/uploads/2026/10/fortis-greenwich-basement-boiler-installation-03.webp

Tricky access. Careful calculations. Out of hours.

Why choose Fortis for basement plant installations?

Basement plant rooms are some of the hardest places to get heavy equipment into. Fortis uses mini cranes, gantries and specialist handling kit, backed by proper load calculations, to install plant where access is tight. Replacing boilers or plant below ground? Contact Fortis Heavy Lift Group.

https://fortislift.co.uk/staging/wp-content/uploads/2026/10/fortis-power-load-moving-system-01.webp

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.