Tower Crane Management
Project Overview
Marshall Construction, a family-run contractor for over 120 years, chose Fortis Heavy Lift Group as its lifting partner for Brazennose House in Manchester city centre. The building has a steel frame and a precast concrete façade, so the crane solution had to deliver substantial capacity at set radii.
Fortis recommended a Potain MR 608 luffing jib tower crane with a 60-metre jib. Fortis also supported site set-up, delivered contract lifts and planned crane rescue and future roof plant access.
The Challenge
Marshall Construction needed a crane solution that could build Brazennose House safely in a busy city-centre location.
Several challenges had to be overcome:
- Choosing a crane with enough capacity at the radii required
- Lifting heavy steel and precast façade elements over a dense city centre
- Keeping everyone on site safe during complex lifting operations
- Planning how heavy roof plant would be serviced and replaced in future
The Solution
Working closely with Marshall Construction, Fortis recommended the Potain MR 608 luffer to meet the project’s lifting demands. A luffing jib keeps the crane’s oversail tight on a city-centre site.
Fortis engaged early with the crane supplier, which allowed full site assessments and a smooth integration of the crane into the project. Our team also helped set up the site infrastructure, including the welfare accommodation, and delivered mobile crane contract lifts where needed.
Fortis provided rescue planning and self-evacuation training for the crane operators. We also carried out crane feasibility studies, so future servicing and replacement of the heavy roof plant could be done without surprises.
Specialist Equipment
Potain MR 608 luffing jib tower crane
A 60-metre luffer with the capacity at radius needed for steel and precast cladding.
Mobile crane contract lifts
Supporting lifts, including setting up the site welfare cabins, alongside the tower crane.
Rescue planning and self-evacuation training
Fortis-planned procedures and operator training to keep everyone at height safe.


A crane strategy built for the life of the building
The Potain MR 608 ran smoothly throughout, giving precise and efficient lifting that moved the project forward.
With careful planning and a strong safety focus, Marshall Construction and Fortis delivered Brazennose House and set up a plan for how the building’s roof plant will be maintained in years to come.