Tower Crane Management

Project Overview

Marshall Construction, a family-run contractor for over 120 years, chose Fortis Heavy Lift Group as its lifting partner for Brazennose House in Manchester city centre. The building has a steel frame and a precast concrete façade, so the crane solution had to deliver substantial capacity at set radii.

Fortis recommended a Potain MR 608 luffing jib tower crane with a 60-metre jib. Fortis also supported site set-up, delivered contract lifts and planned crane rescue and future roof plant access.

  • Location: Brazennose House, Manchester city centre

  • Client: Marshall Construction

  • Tower Crane: Potain MR 608 luffing jib, 60-metre jib

  • Structure: Steel frame with precast concrete façade

  • Services: Crane selection, site set-up support, contract lifts, rescue planning

  • Training: Self-evacuation training for crane operators

  • Future-Proofing: Crane feasibility studies for roof plant servicing

The Challenge

Marshall Construction needed a crane solution that could build Brazennose House safely in a busy city-centre location.

Several challenges had to be overcome:

  • Choosing a crane with enough capacity at the radii required
  • Lifting heavy steel and precast façade elements over a dense city centre
  • Keeping everyone on site safe during complex lifting operations
  • Planning how heavy roof plant would be serviced and replaced in future

The Solution

Working closely with Marshall Construction, Fortis recommended the Potain MR 608 luffer to meet the project’s lifting demands. A luffing jib keeps the crane’s oversail tight on a city-centre site.

Fortis engaged early with the crane supplier, which allowed full site assessments and a smooth integration of the crane into the project. Our team also helped set up the site infrastructure, including the welfare accommodation, and delivered mobile crane contract lifts where needed.

Fortis provided rescue planning and self-evacuation training for the crane operators. We also carried out crane feasibility studies, so future servicing and replacement of the heavy roof plant could be done without surprises.

Specialist Equipment

Potain MR 608 luffing jib tower crane

A 60-metre luffer with the capacity at radius needed for steel and precast cladding.

Mobile crane contract lifts

Supporting lifts, including setting up the site welfare cabins, alongside the tower crane.

Rescue planning and self-evacuation training

Fortis-planned procedures and operator training to keep everyone at height safe.

Mobile crane setting up site welfare beside the Brazennose House development in Manchester
All-terrain mobile crane stacking site welfare cabins at Brazennose House, Manchester

A crane strategy built for the life of the building

The Potain MR 608 ran smoothly throughout, giving precise and efficient lifting that moved the project forward.

With careful planning and a strong safety focus, Marshall Construction and Fortis delivered Brazennose House and set up a plan for how the building’s roof plant will be maintained in years to come.

All-terrain mobile crane stacking site welfare cabins at Brazennose House, Manchester

Planned for the build. Planned for the future.

Why choose Fortis for tower crane management in Manchester?

The right tower crane, properly managed, sets the pace for a whole project. Fortis advises on crane selection, manages erection and dismantling, and supplies Appointed Persons, crane supervisors, operators and slinger signallers. Planning a city-centre build in Manchester? Contact Fortis Heavy Lift Group.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.

Lifting Excellence in Action