Tower Crane Management
Project Overview
Mace brought in Fortis Heavy Lift Group to provide tower crane personnel for the new Primark development in Birmingham city centre. Fortis supplied day-shift and night-shift crane teams on rotation to keep the project on programme.
Our teams ran all lifting operations on the site’s Wolff 275 B luffing jib tower crane, from the controlled demolition of the existing structure to the installation of steelwork for the new build.
The Challenge
The programme needed lifting to run around the clock in one of the busiest parts of Birmingham.
Several challenges had to be overcome:
- Staffing rotating day and night shifts without gaps
- Controlled demolition lifts on the existing structure
- Reinstalling heavy steelwork for the new building
- Lifting safely in a dense city centre, close to the Rotunda and Bullring
The Solution
Fortis set up dedicated day-shift and night-shift crane teams, rotating to keep lifting going in step with the programme.
Our crane teams ran every lift on the site’s Wolff 275 B luffer. A luffing jib suits tight city sites, because it keeps oversail to a minimum. The teams took the structure down piece by piece in a controlled sequence, then lifted in the steelwork for the new build.
Specialist Equipment
Wolff 275 B luffing jib tower crane
A powerful luffer suited to a tight city-centre site, handling both demolition and steelwork lifts.
Day and night shift crane teams
Rotating crews of operators, supervisors and slinger signallers to keep lifting continuous.
Controlled demolition lifting
Planned, sequenced lifts to take down the existing structure safely.


Around the clock, on schedule
Fortis crane teams kept lifting operations running day and night, supporting both the demolition phase and the steelwork for the new Primark store.
Mace kept its programme on track with a dependable, fully staffed crane operation.