Tower Crane Management
Project Overview
Fortis Heavy Lift Group delivered full tower crane management and technical rigging for Marshall Construction on the Portland Street Hotel development. It was our second major tower crane management contract with Marshall, following our joint success at Queen Street, Leeds.
Brought in at tender stage, Fortis took total responsibility for assessing, planning and managing the high-capacity lifts. That covered the hotel’s structural steel frame and its exceptionally heavy precast concrete cladding.
The Challenge
The hotel needed a lifting solution for a dense steel frame and very heavy precast cladding, all within a confined urban footprint.
Several significant challenges had to be overcome:
- Heavy precast concrete panels lifted at radius
- Tight structural clearances around the site
- Safe erection and dismantle of a large tower crane
- Coordinating sub-contract lifts by other trades
- Keeping installation speeds high throughout the build
Marshall needed one partner to own the vertical logistics from start to finish.
The Solution
Fortis engineered a lifting framework around a powerful Wolff WK 355B luffing jib tower crane, sized for the cladding loads and suited to the tight site.
A Fortis Appointed Person provided lift assurance through erection and dismantle. Day to day, our in-house crew of Appointed Person, crane supervisors, slinger/signallers and tower crane operators ran operations.
Fortis also reviewed and accepted third-party RAMS for all complex sub-contract lifts, and delivered site-specific rescue planning and evacuation training.
Specialist Equipment
To keep heavy steel and cladding moving safely, Fortis deployed:
Wolff WK 355B luffing jib tower crane
The WK 355B gave the capacity for heavy precast panels while its luffing jib worked within tight urban clearances.
Mobile and mini cranes
Supporting mobile crane contract lifts and mini crane services handled secondary loads across the site.
Plant handling services
Additional plant handling movements kept materials flowing to the main crane and the work face.


From tender to handover, without a lifting incident
Every structural steel and precast cladding lift was completed with zero lifting incidents.
Pairing the Wolff WK 355B with supplementary mini cranes let the project team hold optimum installation speeds. Lift governance, rescue readiness and RAMS reviews ran consistently throughout.
The project strengthened a long-term partnership with Marshall Construction, and Fortis’s standing as a multi-disciplinary heavy lift partner for tier-1 developments.