Project Overview
Fortis Heavy Lift Group completed a high-capacity contract lift in Bedford for a long-standing client. The scope was the safe offloading and precise positioning of a 37-tonne Combined Heat and Power (CHP) unit onto its foundation.
Under a Full Contract Lift, Fortis took total responsibility for planning, management and execution. Our in-house team engineered the lift plan and delivered it on site with a Demag AC 220-5 mobile crane.
The Challenge
The CHP unit was a single, heavy, critical asset. It needed high-capacity machinery and left no margin for error.
Several significant challenges had to be overcome:
- A 37-tonne load at a demanding lifting radius
- Exact balance and rigging geometry
- Structural clearances around the lift area
- Ground-bearing capacity for the crane set-up
- Precise landing onto a fixed foundation
With one asset and one lift, the plan had to be right before the crane arrived.
The Solution
Fortis’s internal engineering team mapped every element of the lift in advance, accounting for structural clearances and ground-bearing capacities.
A Demag AC 220-5 mobile crane, configured with full counterweight, gave the capacity needed at radius. Our own rigging crews, slinger/signallers and lift supervisors then delivered a controlled, smooth and predictable lift.
Specialist Equipment
To deliver a safe, BS 7121-compliant lift, Fortis deployed:
Demag AC 220-5 mobile crane
Run on full counterweight, the AC 220-5 handled the weight and radius of the 37-tonne unit with capacity to spare.
In-house lift team
Dedicated Fortis riggers, slinger/signallers and lift supervisors ran the operation from start to finish.
Engineered lift plan
An ultra-precise plan, drawn up internally, covered rigging geometry, clearances and ground-bearing capacity.


One lift, landed with millimetre accuracy
With the planning done, the lift itself ran exactly as designed.
The 37-tonne CHP unit was offloaded, lifted, transferred and lowered onto its foundation with millimetre accuracy, ready for its final operational role.
The project reflects a long-standing partnership, and the trust that comes from delivering complex lifts right first time.