Project Overview

Fortis Heavy Lift Group completed a high-capacity contract lift in Bedford for a long-standing client. The scope was the safe offloading and precise positioning of a 37-tonne Combined Heat and Power (CHP) unit onto its foundation.

Under a Full Contract Lift, Fortis took total responsibility for planning, management and execution. Our in-house team engineered the lift plan and delivered it on site with a Demag AC 220-5 mobile crane.

  • Location: Bedford, UK

  • Project Type: Full Contract Lift (BS 7121 compliant)

  • Asset Lifted: 37-tonne Combined Heat and Power (CHP) unit

  • Crane: Demag AC 220-5 with full counterweight

  • Lift Team: In-house riggers, slinger/signallers and lift supervisors

  • Positioning: Millimetre accuracy onto foundation

The Challenge

The CHP unit was a single, heavy, critical asset. It needed high-capacity machinery and left no margin for error.

Several significant challenges had to be overcome:

  • A 37-tonne load at a demanding lifting radius
  • Exact balance and rigging geometry
  • Structural clearances around the lift area
  • Ground-bearing capacity for the crane set-up
  • Precise landing onto a fixed foundation

With one asset and one lift, the plan had to be right before the crane arrived.

The Solution

Fortis’s internal engineering team mapped every element of the lift in advance, accounting for structural clearances and ground-bearing capacities.

A Demag AC 220-5 mobile crane, configured with full counterweight, gave the capacity needed at radius. Our own rigging crews, slinger/signallers and lift supervisors then delivered a controlled, smooth and predictable lift.

Specialist Equipment

To deliver a safe, BS 7121-compliant lift, Fortis deployed:

Demag AC 220-5 mobile crane

Run on full counterweight, the AC 220-5 handled the weight and radius of the 37-tonne unit with capacity to spare.

In-house lift team

Dedicated Fortis riggers, slinger/signallers and lift supervisors ran the operation from start to finish.

Engineered lift plan

An ultra-precise plan, drawn up internally, covered rigging geometry, clearances and ground-bearing capacity.

Fortis slinger/signaller guiding a CHP unit of it's transporter
Demag AC 220-5 crane lifting a 37-tonne CHP unit in Bedford

One lift, landed with millimetre accuracy

With the planning done, the lift itself ran exactly as designed.

The 37-tonne CHP unit was offloaded, lifted, transferred and lowered onto its foundation with millimetre accuracy, ready for its final operational role.

The project reflects a long-standing partnership, and the trust that comes from delivering complex lifts right first time.

All-terrain mobile crane stacking site welfare cabins at Brazennose House, Manchester

Planned for the build. Planned for the future.

Why choose Fortis for contract lifting?

With a Full Contract Lift, Fortis takes on the planning, management and risk, so you don’t have to. Our experts draft the plan and our own crews deliver it on site. We operate across the whole of the UK. To discuss your next lift, call our team or contact Fortis Heavy Lift Group today.

Operator steering a transformer on a power load moving system along a corridor by remote

Equipment spotlight

Power load moving systems

Our remote-controlled power load moving systems drive heavy plant across floors, through doorways and into lifts with millimetre control, with no pushing, no pulling and fewer people near the load. They’re the safest way to move transformers, switchgear and machinery inside a building.