Project Overview

Fortis Heavy Lift Group delivered a full plant and machinery replacement at the iconic Lloyds Bank building on Colmore Row, Birmingham. The scope covered extraction, heavy lifting and precision installation of hundreds of mechanical assets across every floor of the building.

Operating in a tightly restricted city-centre location, the project combined complex contract lifting with temporary structural roof support. All crane work was coordinated around council-approved road closures, with no margin for overrun.

  • Location: Colmore Row, Birmingham city centre

  • Primary Crane: 450-tonne Liebherr mobile crane with luffing jib

  • Secondary Crane: Jekko spider crane, roof-mounted

  • Main Assets: Air Handling Unit (AHU) sections and thermal wheel

  • Asset Volume: Hundreds of mechanical items across all floors

  • Specialist Techniques: Tandem “top and tailing” lifts

  • Programme: Completed within council road closure permits

  • Safety Performance: 100% safe execution

The Challenge

The project brought two high-risk demands together: operating a crane on a roof of unknown load capacity, and delivering to fixed city-centre traffic deadlines.

Several significant challenges had to be overcome:

  • Limited or unknown roof weight tolerances
  • A tight, high-footfall perimeter on Colmore Row
  • A compressed lifting window set by council road closures and permits
  • Large AHU sections to lift to high level and assemble on the roof
  • Heavy fluid tanks to upright inside a confined upper plant room

Any delay to the lift schedule risked losing the road closure, so planning had to be exact.

The Solution

Fortis engineers carried out rigorous load-bearing assessments of the roof, then designed a custom support solution spreading the spider crane’s load across critical structural points.

Heavy-duty Ekki mats were laid across the roof working area before any lifts began. With the roof protected, the 450-tonne Liebherr fed AHU sections up from the street while the Jekko spider crane assembled them in position.

Inside, the team used tandem “top and tailing” lifts to manoeuvre and upright heavy fluid tanks in the confined plant room.

Specialist Equipment

To work safely at height in a live city centre, Fortis deployed:

450-tonne Liebherr mobile crane with luffing jib

The luffing jib gave the reach needed to lift large AHU sections from street level onto the building’s high-level roof.

Jekko spider crane

A compact spider crane, working directly on the roof, assembled the AHU components and thermal wheel in their final positions.

Structural roof support and Ekki mats

A bespoke load-bearing solution and heavy-duty Ekki mats distributed the spider crane’s weight and protected the building’s structure.

Jekko spider crane on Ekki mats assembling an air handling unit on a Birmingham roof
Fortis team uprighting a fluid tank in an upper-floor plant room

Every floor, every permit window, every lift

With the roof engineered and protected, the AHU and thermal wheel were assembled without issue.

Across the building, hundreds of mechanical items were lifted, transferred and positioned on every level. Crane set-up, lifting and de-mobilisation all landed inside the council’s road closure windows.

The result was a seamless multi-floor plant replacement, delivered on time with zero safety incidents.

450-tonne Liebherr luffing jib crane lifting an AHU section onto Lloyds Bank, Colmore Row

Why choose Fortis for city-centre plant replacement?

Engineered for the city. Delivered on time.

Lifting in the heart of a city takes more than heavy machinery. It takes structural analysis, permit management and a lift plan that works first time. Contact Fortis Heavy Lift Group to discuss your next urban project.